Mast Lift Restoration - Before
Before
Mast Lift Restoration - After
After

Machine Type / Model:

Mast lift / 9753WXY

Duration: 3 weeks

Scope of work:

Frame restoration, hydraulics and final testing

Outcome:

Restored platform ready for dependable operation

The mast lift received a complete technical restoration and a final safety-focused inspection.

Step 1 : Restoration plan

The machine condition was documented and the restoration work was planned.

Issue addressed: Structural wear and hydraulic service needs identified.

Quality check: The work was checked and documented before proceeding to the next workshop stage.

Restoration plan

Step 2 : Component restoration and rebuild

Worn assemblies are dismantled, cleaned, and prepared with inspected replacement parts for a reliable rebuild.

Focus: Hydraulic hoses, pins, bearing points, electrical connections, and load-bearing components are assessed for wear.

Quality check: Restored components are measured, adjusted, and checked for safe operation before installation.

Component restoration and rebuild

Step 3 : Functional testing and handover

All repaired and restored functions are tested under realistic operating conditions.

Focus: Controls, safety systems, and smooth platform movement are confirmed before release.

Quality check: Completed work and test findings are documented for a traceable handover.

Functional testing and handover
Boom Lift Overhaul - BeforeBefore
Boom Lift Overhaul - AfterAfter

Machine Type / Model:

Boom lift / 2468LMN

Duration: 5 weeks

Scope of work:

Hydraulic overhaul, structural inspection and coating

Outcome:

Long-term reliability restored for demanding sites

Telescopic Lift Rebuild - BeforeBefore
Telescopic Lift Rebuild - AfterAfter

Machine Type / Model:

Telescopic lift / 7531KLM

Duration: 6 weeks

Scope of work:

Complete teardown, component renewal and testing

Outcome:

Renewed equipment with dependable lifting performance

Green Platform Restoration - BeforeBefore
Green Platform Restoration - AfterAfter

Machine Type / Model:

Aerial platform / 1234YKM

Duration: 3 weeks

Scope of work:

Diagnostics, repairs & repainting

Outcome:

Restored to full operational safety & performance

Yellow Platform Rebuild - BeforeBefore
Yellow Platform Rebuild - AfterAfter

Machine Type / Model:

Aerial platform / 5678ABC

Duration: 4 weeks

Scope of work:

Full mechanical rebuild and repainting

Outcome:

Returned to reliable working condition